Chapter 1 Tender Notice
[Indonesia Semarang-Demak Toll Road Project Section 1B Geotextile]
Material Procurement Tender Notice
1. Tender Conditions
This project has been approved for construction by the Indonesian Ministry of Public Works, and the construction funds have been secured. The geotextile for the project is now ready for public tender. This tender will be conducted through [online electronic bidding]}.
2. Project Overview and Tender Scope
2.1 Project Overview:
Construction Location: The Indonesia Semarang-Demak Toll Road Project Section 1B (hereinafter referred to as "this project") is located in Semarang City, Central Java Province, Indonesia, with an overall east-west orientation. The starting point of this project is at stake K4+425, and the endpoint is at stake K8+314.
Construction Scale: 3.7 km of seawall road, 1 river-crossing bridge and its approach bridge, 1 service area, and toll stations with ancillary works.
Planned Construction Period: 36 months.
Start Date: August 7, 2023; Planned Completion Date: April 26, 2027 (according to Amendment Contract No. 5).
2.2 Tender Scope: The detailed list of materials and quotation requirements for the tender are provided in the attachment "Tender Document Quotation Form."
3. Bidder Qualification Requirements
3.1 Bidders must meet the following qualification requirements:
Business Scope Requirements: The bidder must be legally registered in Indonesia as an independent legal entity, and must be a manufacturer, agent, distributor, or trader with good social reputation and financial status, and must not have been penalized by municipal or higher administrative authorities. The bidder must possess valid NIB, NPWP, and KTP documents, have the qualification of a general VAT taxpayer, and be a supplier at the first-level company, first-level bureau, or China Communications Construction Group (CCCG) level in the CCCG supply chain management information system.
Production Capacity Requirements: The bidder or the manufacturer represented by the bidder must have at least 1 year of experience in producing similar products, and must have the necessary personnel, equipment, and financial resources, as well as the ability to supply, store, and transport the materials.
Financial Capability Requirements: The bidder must have a complete financial operating system and good financial status, and must have the ability to bear the advance payment required for supplying the materials.
Quality Assurance Requirements: Refer to the relevant requirements of the Indonesian Ministry of Public Works and Housing, Directorate General of Highways (August 2020 edition).
Supply Performance Requirements: The bidder must have experience in supplying materials for engineering projects and must have a complete service and supply system.
Performance Credit Requirements: The bidder must have a good social reputation, must not be listed on the blacklist of the local quality supervision department or the tenderer's enterprise blacklist, must not have been involved in any litigation or arbitration related to contract fraud or serious illegal activities in the past 3 years, must not have seriously breached any contracts or been expelled in the past 3 years, must not have had its assets taken over or frozen, and must not be in a state of being prohibited or disqualified from bidding. Provide a credit certificate issued by the bidder's basic account bank or a performance certificate issued by the buyer or user of similar materials (if applicable).
Invoice Issuance Requirements: The bidder must be able to issue VAT invoices that comply with Indonesian laws and regulations.
3.2 This tender does not accept joint bids.
3.3 Units with the same legal representative or units with controlling or management relationships may not bid for the same package; otherwise, all related bids will be rejected.
3.4 Other Requirements: The bidder must accept all the payment terms, warranty requirements, and after-sales service requirements specified in the tender documents. The bidder must ensure that it can directly supply the materials according to the order after winning the bid, and must actively cooperate with the tenderer's access and inspection work; otherwise, it will be considered a breach of contract by the winning bidder. The bidder must ensure that the provided documents are complete and valid; otherwise, it will bear all legal responsibilities.
4. Acquisition of Tender Documents
4.1 Interested bidders can register and download the electronic tender documents from the CCCG Supply Chain Management Information System at http://ec.ccccltd.cn from [10:00] on [May 15, 2025] to [10:00] on [May 20, 2025] (Beijing Time, the same below, subject to the time specified in the CCCG Supply Chain Management Information System).
4.2 The tender documents for this tender [are free of charge]{.underline}. The tender documents are priced at RMB per set, and the fee will not be refunded after the tender is completed. If the tender is terminated due to force majeure, the tenderer will refund the fee for purchasing the tender documents as required. After completing the remittance, please send the scanned copy of the payment receipt to the email address by [insert date].
4.2.1 Tender Document Fee Receiving Account Information
Account Name:
Bank Name:
Bank Account:
Agricultural Bank Code:
4.3 Potential Supplier Participation:
4.3.1 Suppliers who are already registered in the system and have passed the tenderer's level supplier registration or have added the tenderer as a cooperative unit can directly register to participate.
4.3.2 Suppliers at the same level who have not added the tenderer as a cooperative unit need to apply for a cooperative intention and can participate after approval.
4.3.3 Suppliers who are not registered in the supply chain system need to register, and the recommended unit or cooperative intention unit should select the tenderer. After approval, they can register to participate.
4.3.4 For any questions or registration issues, please consult the tenderer or the tender agent.
5. Submission of Bid Documents
5.1 The deadline for submitting bid documents (hereinafter referred to as the "bid closing time") is [10:00]{.underline} on [March 8, 2025]{.underline} (subject to the time specified in the CCCG Supply Chain Management Information System). Bidders should submit their electronic bid documents through the CCCG Supply Chain Management Information System before the deadline.
5.2 Bid documents received after the deadline will be rejected by the CCCG Supply Chain Management Information System.
5.3 The supplier's quotation documents for electronic procurement consist of the system-entered electronic quotation form and the bid document attachments. If there is any conflict between the electronic quotation form and the bid document attachments, the data in the system-entered electronic quotation form shall prevail.
6. Others
6.1 Settlement Method: Monthly settlement will be executed, with the settlement cycle being from the [16th]{.underline} of the previous month to the [15th]{.underline} of the current month. After the [15th]{.underline} of each month, both parties will verify the supply quantity of the previous settlement cycle and complete the settlement procedures. Party B shall provide legal, valid, and equivalent VAT invoices to Party A as the basis for payment. (If the payment is delayed due to Party B's failure to provide invoices, Party B shall bear the relevant responsibility.)
6.2 Payment Terms: After Party B delivers the materials to the designated receiving location at Party A's site, Party B shall notify Party A for inspection. After the inspection is passed, both parties shall complete the settlement. Party A shall pay the货款 within 30 days after receiving the corresponding invoice and tax ticket. Before Party B provides the tax payment certificate (SPT) to Party A, Party A will deduct the PPN from the payment until Party B provides the corresponding tax payment certificate. The payment of the货款 does not exempt Party B from its responsibility for the quality of the goods. If Party A delays payment, both parties shall negotiate and agree on a deferred payment, but Party B shall not stop supplying the goods without prior written notice to Party A; otherwise, Party B shall bear the losses caused to Party A.
7. Contact Information
Tenderer: [CRBC WIKA PP JO]
Address: [Jalan Terboyo Industri Barat III, Blok E No.1-2 Trimulyo, Genuk, Semarang]
Contact Person: [Wang Yadong]
Phone: [082115650994]
Email: [jerichowang123@gmail.com]
2025 / 5 / 25
7. Contact Information
Tenderer: [CRBC WIKA PP JO]
Address: [Jalan Terboyo Industri Barat III, Blok E No.1-2 Trimulyo, Genuk, Semarang]
Contact Person: [Wang Yadong]
Phone: [082115650994]
Email: [jerichowang123@gmail.com]
IndonesiaSemarang-DemakTollRoadProjectSection1BGeotextileMaterialprocurement(TenderNo:FA00000280061)TenderDocumentTenderer:CRBC-WIKAPPJO2025/5/14TableofContentsVolume12Chapter1TenderNotice31.TenderConditions32.ProjectOverviewandTenderScope33.BidderQualificationRequirements34.AcquisitionofTenderDocuments45.SubmissionofBidDocuments56.Others57.ContactInformation6Chapter2InstructionstoBidders111.GeneralProvisions162.TenderDocuments223.BidDocuments234.Bidding265.BidOpening276.BidEvaluation277.ContractAward288.DisciplineandSupervision309.OtherContentstobeSupplemented31Chapter3BidEvaluationMethod(EvaluatedLowestBidPriceMethod)381.BidEvaluationMethod402.EvaluationCriteria403.BidEvaluationProcedure40Chapter4ContractTermsandFormats42Section1GeneralContractTerms42Section2ContractAttachmentFormats51Volume254Chapter5SupplyRequirements551.ProjectOverviewandGeneralRequirements552.MaterialRequirementsList553.QualityStandards554.AcceptanceStandards555.RelatedServiceRequirements55Volume356Chapter6BidDocumentFormats571.BidLetter602.LegalRepresentativeIdentityCertificate622.PowerofAttorney633.ItemizedQuotationForm644.QualificationDocuments655.RelatedServicePlan726.CreditCommitmentLetter737.OtherDocuments751.1.Chapter1TenderNotice[IndonesiaSemarang-DemakTollRoadProjectSection1BGeotextile]MaterialProcurementTenderNotice1.TenderConditionsThisprojecthasbeenapprovedforconstructionbytheIndonesianMinistryofPublicWorks,andtheconstructionfundshavebeensecured.Thegeotextilefortheprojectisnowreadyforpublictender.Thistenderwillbeconductedthrough[onlineelectronicbidding]}.2.ProjectOverviewandTenderScope2.1ProjectOverview:ConstructionLocation:TheIndonesiaSemarang-DemakTollRoadProjectSection1B(hereinafterreferredtoas"thisproject")islocatedinSemarangCity,CentralJavaProvince,Indonesia,withanoveralleast-westorientation.ThestartingpointofthisprojectisatstakeK4+425,andtheendpointisatstakeK8+314.ConstructionScale:3.7kmofseawallroad,1river-crossingbridgeanditsapproachbridge,1servicearea,andtollstationswithancillaryworks.PlannedConstructionPeriod:36months.StartDate:August7,2023;PlannedCompletionDate:April26,2027(accordingtoAmendmentContractNo.5).2.2TenderScope:Thedetailedlistofmaterialsandquotationrequirementsforthetenderareprovidedintheattachment"TenderDocumentQuotationForm."3.BidderQualificationRequirements3.1Biddersmustmeetthefollowingqualificationrequirements:BusinessScopeRequirements:ThebiddermustbelegallyregisteredinIndonesiaasanindependentlegalentity,andmustbeamanufacturer,agent,distributor,ortraderwithgoodsocialreputationandfinancialstatus,andmustnothavebeenpenalizedbymunicipalorhigheradministrativeauthorities.ThebiddermustpossessvalidNIB,NPWP,andKTPdocuments,havethequalificationofageneralVATtaxpayer,andbeasupplieratthefirst-levelcompany,first-levelbureau,orChinaCommunicationsConstructionGroup(CCCG)levelintheCCCGsupplychainmanagementinformationsystem.ProductionCapacityRequirements:Thebidderorthemanufacturerrepresentedbythebiddermusthaveatleast1yearofexperienceinproducingsimilarproducts,andmusthavethenecessarypersonnel,equipment,andfinancialresources,aswellastheabilitytosupply,store,andtransportthematerials.FinancialCapabilityRequirements:Thebiddermusthaveacompletefinancialoperatingsystemandgoodfinancialstatus,andmusthavetheabilitytobeartheadvancepaymentrequiredforsupplyingthematerials.QualityAssuranceRequirements:RefertotherelevantrequirementsoftheIndonesianMinistryofPublicWorksandHousing,DirectorateGeneralofHighways(August2020edition).SupplyPerformanceRequirements:Thebiddermusthaveexperienceinsupplyingmaterialsforengineeringprojectsandmusthaveacompleteserviceandsupplysystem.PerformanceCreditRequirements:Thebiddermusthaveagoodsocialreputation,mustnotbelistedontheblacklistofthelocalqualitysupervisiondepartmentorthetenderer'senterpriseblacklist,mustnothavebeeninvolvedinanylitigationorarbitrationrelatedtocontractfraudorseriousillegalactivitiesinthepast3years,mustnothaveseriouslybreachedanycontractsorbeenexpelledinthepast3years,mustnothavehaditsassetstakenoverorfrozen,andmustnotbeinastateofbeingprohibitedordisqualifiedfrombidding.Provideacreditcertificateissuedbythebidder'sbasicaccountbankoraperformancecertificateissuedbythebuyeroruserofsimilarmaterials(ifapplicable).InvoiceIssuanceRequirements:ThebiddermustbeabletoissueVATinvoicesthatcomplywithIndonesianlawsandregulations.3.2Thistenderdoesnotacceptjointbids.3.3Unitswiththesamelegalrepresentativeorunitswithcontrollingormanagementrelationshipsmaynotbidforthesamepackage;otherwise,allrelatedbidswillberejected.3.4OtherRequirements:Thebiddermustacceptallthepaymentterms,warrantyrequirements,andafter-salesservicerequirementsspecifiedinthetenderdocuments.Thebiddermustensurethatitcandirectlysupplythematerialsaccordingtotheorderafterwinningthebid,andmustactivelycooperatewiththetenderer'saccessandinspectionwork;otherwise,itwillbeconsideredabreachofcontractbythewinningbidder.Thebiddermustensurethattheprovideddocumentsarecompleteandvalid;otherwise,itwillbearalllegalresponsibilities.4.AcquisitionofTenderDocuments4.1InterestedbidderscanregisteranddownloadtheelectronictenderdocumentsfromtheCCCGSupplyChainManagementInformationSystemathttp://ec.ccccltd.cnfrom[10:00]on[May15,2025]to[10:00]on[May20,2025](BeijingTime,thesamebelow,subjecttothetimespecifiedintheCCCGSupplyChainManagementInformationSystem).4.2Thetenderdocumentsforthistender[arefreeofcharge]{.underline}.ThetenderdocumentsarepricedatRMBperset,andthefeewillnotberefundedafterthetenderiscompleted.Ifthetenderisterminatedduetoforcemajeure,thetendererwillrefundthefeeforpurchasingthetenderdocumentsasrequired.Aftercompletingtheremittance,pleasesendthescannedcopyofthepaymentreceipttotheemailaddressby[insertdate].4.2.1TenderDocumentFeeReceivingAccountInformationAccountName:BankName:BankAccount:AgriculturalBankCode:4.3PotentialSupplierParticipation:4.3.1Supplierswhoarealreadyregisteredinthesystemandhavepassedthetenderer'slevelsupplierregistrationorhaveaddedthetendererasacooperativeunitcandirectlyregistertoparticipate.4.3.2Suppliersatthesamelevelwhohavenotaddedthetendererasacooperativeunitneedtoapplyforacooperativeintentionandcanparticipateafterapproval.4.3.3Supplierswhoarenotregisteredinthesupplychainsystemneedtoregister,andtherecommendedunitorcooperativeintentionunitshouldselectthetenderer.Afterapproval,theycanregistertoparticipate.4.3.4Foranyquestionsorregistrationissues,pleaseconsultthetendererorthetenderagent.5.SubmissionofBidDocuments5.1Thedeadlineforsubmittingbiddocuments(hereinafterreferredtoasthe"bidclosingtime")is[10:00]{.underline}on[March8,2025]{.underline}(subjecttothetimespecifiedintheCCCGSupplyChainManagementInformationSystem).BiddersshouldsubmittheirelectronicbiddocumentsthroughtheCCCGSupplyChainManagementInformationSystembeforethedeadline.5.2BiddocumentsreceivedafterthedeadlinewillberejectedbytheCCCGSupplyChainManagementInformationSystem.5.3Thesupplier'squotationdocumentsforelectronicprocurementconsistofthesystem-enteredelectronicquotationformandthebiddocumentattachments.Ifthereisanyconflictbetweentheelectronicquotationformandthebiddocumentattachments,thedatainthesystem-enteredelectronicquotationformshallprevail.6.Others6.1SettlementMethod:Monthlysettlementwillbeexecuted,withthesettlementcyclebeingfromthe[16th]{.underline}ofthepreviousmonthtothe[15th]{.underline}ofthecurrentmonth.Afterthe[15th]{.underline}ofeachmonth,bothpartieswillverifythesupplyquantityoftheprevioussettlementcycleandcompletethesettlementprocedures.PartyBshallprovidelegal,valid,andequivalentVATinvoicestoPartyAasthebasisforpayment.(IfthepaymentisdelayedduetoPartyB'sfailuretoprovideinvoices,PartyBshallbeartherelevantresponsibility.)6.2PaymentTerms:AfterPartyBdeliversthematerialstothedesignatedreceivinglocationatPartyA'ssite,PartyBshallnotifyPartyAforinspection.Aftertheinspectionispassed,bothpartiesshallcompletethesettlement.PartyAshallpaythe货款within30daysafterreceivingthecorrespondinginvoiceandtaxticket.BeforePartyBprovidesthetaxpaymentcertificate(SPT)toPartyA,PartyAwilldeductthePPNfromthepaymentuntilPartyBprovidesthecorrespondingtaxpaymentcertificate.Thepaymentofthe货款doesnotexemptPartyBfromitsresponsibilityforthequalityofthegoods.IfPartyAdelayspayment,bothpartiesshallnegotiateandagreeonadeferredpayment,butPartyBshallnotstopsupplyingthegoodswithoutpriorwrittennoticetoPartyA;otherwise,PartyBshallbearthelossescausedtoPartyA.7.ContactInformationTenderer:[CRBCWIKAPPJO]Address:[JalanTerboyoIndustriBaratIII,BlokENo.1-2Trimulyo,Genuk,Semarang]ContactPerson:[WangYadong]Phone:[082115650994]Email:[jerichowang123@gmail.com]2025/5/15Attachment1:TenderNoticeAppendixDetailedListofTenderMaterialRequirementsNoTender No.Project NameMaterial NameSpecificationsunitquantitylocationdatemark1FA00000191203Toll developement of Semarang-demak geotextile Class1M2220,319Site of semarang-demak project2025/6/30Indonesian Engineering Quality Standards2No text34Note:Afterwinningthebid,deliverieswillbemadeaccordingtotheactualrequirementsoftheprojectdepartmentbasedontheconstructionprogress.Appendix2:Keypointsforsupplieraudit1.Whenapplyingforcooperationintention,theapplicationstatementmuststatethatyouintendtoparticipateinthebiddingforXXXXmaterialsfortheXXXXproject.2.Thebusinessregistrationnumber,taxnumber,andorganizationcodeinthebasicinformationmustbeconsistentwiththerelevantattachments.3.Theaddressinformationandcompanytypeinthebasicinformationareconsistentwiththebusinesslicense.4.TheregisteredcapitalunitinthebasicinformationisIndonesianrupiah.5.Thebusinessperiodafterthethreecertificatesarecombinedinthebasicinformationisconsistentwiththevalidityperiodoftheorganizationcode.6.Thecompanyprofileinthebasicinformationmustbefilledin,andthemainproductsmustbeclearlystated.7.Theproductinformationmustincludethematerialsparticipatinginthisbid.8.Theattachmentsinthequalificationdocumentsshouldbeclear,legible,authenticandvalidscansoftheoriginals.Appendix3.CreditCommitmentCreditCommitmentInordertocreateanopen,fair,just,honestandtrustworthytradingenvironmentandestablishtheimageofhonestandlaw-abidingsuppliers(subcontractors,serviceproviders,etc.),Iherebymakethefollowingcommitmentsonbehalfofthisunit:(I)Allinformationsubmittedislegal,true,accurateandvalid,withoutanyforgery,modificationorfalsehood,andIamresponsiblefortheauthenticityoftheinformation.(II)Updatetheinformationofthisunitinatimelymannerandberesponsibleforthevalidityoftheinformationprovided.(III)Strictlyabidebylaws,regulations,rulesandmanagementrequirementsnotifiedinadvancebytheprojectunittocarryouttradingactivities;activelyfulfillsocialresponsibilitiesandpromotetheconstructionofcleangovernment.(IV)Self-disciplineandself-management,donotengageinfraud,bidrigging,maliciouscomplaints,bribery,interferencewithtradingactivitiesandotherprohibitedbehaviorsbylawsandregulations,andconsciouslymaintainthegoodorderofprojecttransactions.(V)Abidebycontracts,valuecredit,fulfillcontractsingoodfaith,andconsciouslyacceptthesupervisionofCCCC,projectunits,thepublicandthenewsmedia.(VI)Voluntarilyacceptinspectionsbygovernmentdepartments,CCCCandprojectunitsinaccordancewithlawsandregulations.Ifanyviolationoflawsorregulationsorbadbehavioroccurs,thepartiesshallvoluntarilyacceptthepunishment(handling)givenbythegovernmentdepartments,CCCCandtheprojectunitsinaccordancewiththelawandregulations,andbeartheliabilityforcompensationandcriminalliabilityinaccordancewiththelaw.(VII)ThepartieshaverecognizedandcompliedwiththerelevantprovisionsofCCCCandtheprojectunitsontheblacklistandthekeyfocuslistof"onebreachoftrust,restrictionseverywhere"jointpunishmentandtheco-constructionandsharingofintegrityandhonesty.(VIII)TherearenoCCCCemployeesandtheirrelativesamongthelegalrepresentative,controllingshareholder,actualcontroller,director,supervisor,seniormanagementpersonnel,andprojectteamofthisunit(exceptforthebiddingunitthatisasubsidiaryofCCCC).(IX)Theconcessionstotheprojectunitshouldbemadepublic,andprivatenegotiationswiththeprojectunitemployeesonmatterssuchascontractnegotiation,signing,performanceandbreachofcontractliabilityshallnotbeconducted.Theconcessionsshallnotbetransferredtotheprojectunitemployeesandtheirrelativesinthenameofkickbacks,remuneration,commissions,rewards,allowances,part-timewages,etc.;expensesthatshouldbepaidbytheprojectunitemployeesshallnotbereimbursedorpaid;transportation,communicationtools,high-endofficesuppliesandotheritemsshallnotbeprovided.Donotprovidepropertyortransferbenefitstoprojectunitemployeesandtheirrelatives.Donotmailorgivegifts,cashgifts,consumptioncards(vouchers),securities,equity,stocks,bonds,otherfinancialproducts,localspecialties,paymentvouchers,prepaidcards,electronicredenvelopes,giftcertificates,houses,vehicles,antiques,etc.thatmayaffectfairtrade;donotprovidebanquets,travel,fitness,entertainmentandotheractivitiesthatmayaffectfairtrade;donotprovideconvenienceandpreferentialconditionsforprojectunitemployeesandtheirrelativestodobusinessandrunenterprises,anddonotprovideconveniencefortheiremployment,goingabroad,travelingandvacationing,weddingsandfunerals,children'sschooling,jobpromotion,workarrangements,purchaseordecorationofhouses,investmentorbuyingandsellingstocksandbonds;donotprovideloansorborrowhousesandvehiclesforvariousreasons;donotprovidecommercialbribesindisguisedformsunderthenamesofcharitabledonations,socialresponsibilityexpenses,etc.DonotaskprojectunitemployeesaboutbusinesssecretsinvolvingCCCCandprojectunits;whenCCCCandprojectunitsconductinvestigationsonsuspectedunethicalbusinesspractices,theyareobligedtocooperateandprovideevidencematerials.Otherintegrityrequirements(addedbyeachunit).(X)Ihavecarefullyreadandapprovedtheabovecommitment,andhavepromotedandeducatedthestaffofthisunit.Signatureofthelegalrepresentative:Unitname(seal)Date:ChapterIIInstructionsforBiddersNOClauseNameContents1.1.1Tender No.FA000002800611.1.2TendererName:CRBC-WIKA-PP JOAdress:Jalan Terboyo Industri Barat III, Blok E No.1-2Trimulyo, Genuk, Semarangcontact:WANG YADONGPhone number:0821156509931.1.3Tendering Organizationname:CRBC-WIKA-PP JOadress:Jl. Terboyo Industri Barat 3 No.1, RW.2, Trimulyo, Kec. Genuk, Kabupaten Demak, Jawa Tengah 50112,Indonesianame:wanyadongPhone number:+62 821-1565-09931.1.4Name of the biddingOpen bidding for the procurement of geotextile1.1.5Name of the projectSection 1B of the Semarang to Demark Toll Road Project in Indonesia1.2Source of funds and implementation statusFunding has been secured1.3.1Tender Contentgeotextile1.3.2Delivery dateDelivery date: 2025.6-2025.8Delivery start: 2025. 6.301.3.3Delivery locationConstruction site of Section 1B of the Semarang to Demark Toll Road Project in Indonesia1.3.4Quality standardQuality standards of the Indonesian Engineering Department1.4.1The bidder should have the ability to supply the materials for this bidding(1) Business scope requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(2) Production capacity requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(3) Financial capacity requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(4) Quality assurance capacity requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(5) Supply performance requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(6) Performance credit requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcement(7) Invoice issuance requirements: see the "Qualification Requirements of Bidders" in the first chapter of the tender announcementNOClauseNameContents1.4.2Whether to accept the consortium bidno1.4.3Other circumstances that the bidder shall not existInitiated litigation or arbitration against the tenderer1.9.1Preparatory meeting for biddingno1.9.2Questions raised by the bidder before the preliminary meeting for biddingTime:/Format:/1.9.3The bidder issues clarification of the bidding documentsublished in the form of supply chain system information.1.10.1Substantive requirements and conditionsThe quality shall not be lower than the requirements of the bidding documents, and the payment terms may be better than the requirements of the tenderer.1.10.3Other acceptable technical support materialsN/A1.10.4DeviationsNO2.1Other materials constituting the bidding documents/2.2.1The bidder requests clarification of the bidding documentsTime: 15 days before the bid deadline2.2.2The form in which the clarification of the bidding documents is issuedPublished through the supply chain system information form.2.2.3The bidder confirms receipt of the clarification of the bidding documentsDeadline: Within 48 hours after receiving the clarification (based on the time of issuance).Form: Click to receive confirmation through the supply chain system.2.3.1The form in which the amendment of the bidding documents is issuedForm: Published through the supply chain system information form.NOClause NameContents2.3.2the bidder confirms receipt of the modification of the bidding documentsDeadline: Within 48 hours after receiving the modification (based on the time of issuance).Form: Click to receive and confirm through the supply chain system.3.1.1Other materials constituting the bidding documentsCalculation method of value-added taxSupplements and commitments issued by bidders before the bid opening are regarded as other materials constituting the bidding documents.3.2.1Calculation method of value-added tax11%3.2.4Maximum bidding priceNo3.2.5ther requirements for bidding quotationsJust make a quotation according to the bidding document format.3.3.1Validity period of the biddingValid until the contract is executed3.4.1Bidding depositno3.4.4Other circumstances where the bidding deposit may not be refundedno3.5.1Special requirements for qualification review materialsno3.5.2Year requirements for financial status in recent years2024.1-2024.123.5.3Time requirements for similar projects completed in recent yearsNo3.5.5Time requirements for litigation and arbitration in recent years2022/1/ 1 TO 2024/10/303.6.1Whether to allow submission of alternative bidding plansNO3.7.3A(2)Number of copies of bidding documents and other requirementsNumber of copies of bidding documents: 1Is electronic version of documents required: YesOther requirements: None3.7.3A(3)Whether the bidding documents need to be bound in separate volumesNONOClauseNameContents3.7.3(B)requirement of attachment in bidding document It should be the original or scanned copy (with the official seal of the unit)3.7.3(B)signature and stamp requirement of the bidding document The paper version of the bid document shall be uploaded as a bid attachment after signing and stamping, and the PDF format scan is required to be uploaded.4.1.1(B)Bid Document Encryption Requirements/4.1.2the information required on the coverThe name of the attachment should be changed to "(Name of Bidder) Bidding Document4.2.1DeadlineDeadline: May 30, 2025 (the specific time is subject to the time required by the CCCC Supply Chain Management Information System)4.2.2(A)Location of submissionSubmit online through the CCCC Supply Chain Management Information System and upload it to the system as an attachment when bidding.4.2.3refund of the bidding documentsNo5.1(A)Opening time and locationOpening time: Same as the bidding deadlineOpening location: Online bidding in the China Communications Construction Material Procurement Management Information System5.2(4)(A)Opening orderOpening order: Open at the same time, regardless of order.6.1.1Composition of the Bid Evaluation Expert CommitteeComposition of the Bid Evaluation Expert Committee: 5 people, including 0 representatives of the tenderer and 5 experts.Method for determining the bid evaluation experts: random selection or appointment by the tenderer.6.3.2quantity of the recommended by Committee37.1Announcement Medium and Duration for the Winning CandidatePublication medium: CCCC Supply Chain Information SystemPublication period: 3 days7.4Authorization for the Bid Evaluation Committee to Determine the Winning Bidder是否授权评标委员会确定中标人no7.4.1performance bondAre successful bidders required to submit performance bond: noNOClauseNameContents8Whether to adopt electronic biddingYes, specific requirements: Implement according to the regulations on CCCC Supply Chain Management Information System http://ec.ccccltd.cn.9Other content that needs to be supplementedThe contents of the appendix to Chapter 2 are for reference only. The specific documents issued by CCCC Supply Chain Management Information System http://ec.ccccltd.cn shall prevail.1.GeneralProvisions1.1OverviewoftheBiddingProject1.1.1Accordingtotherelevantlaws,regulationsandrulessuchastheBiddingLawofthePeople'sRepublicofChinaandtheRegulationsfortheImplementationoftheBiddingLawofthePeople'sRepublicofChina,thisbiddingprojecthasmetthebiddingconditionsandisnowbiddingformaterialprocurement.1.1.2Bidder:SeethetablebeforetheInstructionstoBidders.1.1.3BiddingAgency:SeethetablebeforetheInstructionstoBidders.1.1.4NameoftheBiddingProject:SeethetablebeforetheInstructionstoBidders.1.1.5NameoftheEngineeringProject:Theengineeringconstructionprojecttowhichthebiddingprojectbelongs,seethetablebeforetheInstructionstoBidders.1.2SourcesandImplementationofFundsfortheBiddingProject1.2.1Sourcesandproportionsoffunds:SeethetablebeforetheInstructionstoBidders.1.2.2Implementationoffunds:SeethetablebeforetheInstructionstoBidders.1.3Biddingscope,deliverydate,deliverylocationandqualitystandards1.3.1Biddingscope:seethetablebeforetheinstructionstobidders.1.3.2Deliverydate:seethetablebeforetheinstructionstobidders.1.3.3Deliverylocation:seethetablebeforetheinstructionstobidders.1.3.4Qualitystandards:seethetablebeforetheinstructionstobidders.1.4Bidderqualificationrequirements1.4.1Biddersshouldhavethequalifications,capabilitiesandreputationtoundertakethisbiddingproject:(1)Qualificationrequirements:seethetablebeforetheinstructionstobidders;(2)Financialrequirements:seethetablebeforetheinstructionstobidders;(3)Performancerequirements:seethetablebeforetheinstructionstobidders;(4)Reputationrequirements:seethetablebeforetheinstructionstobidders;(5)Otherrequirements:seethetablebeforetheinstructionstobidders.Ifthebidderisanagentdistributor,thequalificationrequirementsforthebidderincludethequalificationrequirementsforthemanufacturer,andtheperformancerequirementsforthebidderincludetheperformancerequirementsforthebiddingmaterials.TherelevantsupportingmaterialstobesubmittedareasprovidedinSection3.5ofthischapter.1.4.2WheretheconsortiumbidisacceptedasprovidedintheprecedingtableoftheInstructionstoBidders,theconsortiumshallcomplywiththefollowingprovisionsinadditiontotherequirementsofSection1.4.1ofthischapterandtheprecedingtableoftheInstructionstoBidders:(1)Allpartiestotheconsortiumshallsignaconsortiumagreementintheformatprovidedinthebiddingdocuments,clearlydefiningtherightsandobligationsoftheconsortiumleaderandallparties,andcommittingtoassumejointandseveralliabilitytothetendererforthewinningproject;(2)Foraconsortiumcomposedofunitsofthesameprofession,thequalificationlevelshallbedeterminedinaccordancewiththeunitwiththelowerqualificationlevel;(3)Allpartiestotheconsortiumshallnotbidinthisbiddingprojectaloneorinconjunctionwithotherconsortiumsintheirownname,otherwiseallrelevantbidsshallbeinvalid.1.4.3Thebiddershallnotbeinanyofthefollowingcircumstances:(1)Havingaconflictofinterestwiththetendererthatmayaffectthefairnessofthetender;(2)Beingtheheadofthesameunitasotherbiddersforthistenderproject;(3)Havingadirector,supervisororseniormanagerrelationshipwithotherbiddersforthistenderproject;(4)Providingconsultingservicesforthedesign,preparationoftechnicalspecificationsandotherdocumentsforthistenderproject;(5)Beingthesupervisorofthisproject,orhavingasubordinaterelationshiporotherrelationshipwiththesupervisorofthisproject.=Interestedrelationship;(6)Beingtheconstructionagentofthisbiddingproject;(7)Beingthebiddingagencyofthisbiddingproject;(8)Havingthesamelegalrepresentativeasthesupervisor,constructionagentorbiddingagencyofthisbiddingproject;(9)Havingacontrollingorparticipatingrelationshipwiththesupervisor,constructionagentorbiddingagencyofthisbiddingproject;(10)Beingsuspendedorcancelledfrombiddingaccordingtolaw;(11)Beingorderedtosuspendproductionandbusiness,temporarilysuspendorrevokethelicense,temporarilysuspendorrevokethelicense;(12)Enteringintoliquidationprocedure,orbeingdeclaredbankrupt,withthepropertytakenoverorfrozen,orothercircumstancesoflosingtheabilitytoperformthecontract;(13)Havingmajorproductqualityproblemsinthepastthreeyears(subjecttotheadministrativepenaltydecisionoftherelevantindustrycompetentdepartmentortherelevantlegaldocumentsissuedbythejudicialauthority);(14)Beinglistedinthelistofseriouslyillegalanddishonestenterprisesinthenationalenterprisecreditinformationdisclosuresystembytheindustrialandcommercialadministrativeauthorities;(15)BeinglistedbytheSupremePeople'sCourtonthe"CreditChina"website(www.creditchina.gov.cn)orcreditinformationsharingplatformsatalllevelsTaichungisincludedinthelistofdishonestpersonssubjecttoenforcement;(16)Inthepastthreeyears,thebidderoritslegalrepresentativeortheproposedprojectmanagerhascommittedabriberycrime(subjecttothequeryresultsissuedbythedutycrimepreventiondepartmentoftheprocuratorate);(17)BiddersincludedintheCCCCblacklistsystemshallnotparticipateinthebiddingactivitiesofthecorrespondinglevelandsubordinatebiddersduringtheprohibitionperiod.(18)Othercircumstancesstipulatedbylawsandregulationsorthetablebeforethebidder'sinstructions.1.5CostsThebiddershallbeartheexpensesincurredinpreparingandparticipatinginthebiddingactivities.1.6ConfidentialityAllpartiesinvolvedinthebiddingactivitiesshallkeepconfidentialthecommercialandtechnicalsecretsinthebiddingdocumentsandbiddingdocuments,otherwisetheyshallbearthecorrespondinglegalresponsibilities.1.7LanguageThelanguageusedinthebiddingdocumentsshallbeEnglish,ChineseorIndonesian.1.8UnitsofmeasurementAllmeasurementsshallbemadeinIndonesianlegalunitsofmeasurement.1.9Preparatorymeetingforbidding1.9.1Ifthepreparatorymeetingforbiddingisrequiredintheappendixtotheinstructionstobidders,thetenderershallholdthepreparatorymeetingforbiddingatthetimeandplacespecifiedintheappendixtotheinstructionstobidderstoclarifythequestionsraisedbythebidders.1.9.2Thebiddershalldeliverthequestionsraisedtothetendereratthetimeandintheformspecifiedintheappendixtotheinstructionstobidderssothatthetenderercanclarifythemduringthemeeting.1.9.3Afterthepreparatorymeetingforbidding,thetenderershallnotifyallbidderswhohavepurchasedthebiddingdocumentsoftheclarificationofthequestionsraisedbythebiddersintheformspecifiedintheappendixtotheinstructionstobidders.Theclarificationcontentshallbeanintegralpartofthebiddingdocuments.1.10Responseanddeviation1.10.1Thebiddingdocumentsshallrespondtothesubstantiverequirementsandconditionsofthebiddingdocumentsinamannerthatsatisfiesorismorefavorabletothetenderer,otherwise,thebidder'sbidwillberejected.Thesubstantiverequirementsandconditionsareshownintheappendixtotheinstructionstobidders.1.10.2Thebiddershallprovideadetaileddescriptionofthequalitystandardsofthebiddingmaterials,technicalsupportmaterialsandrelatedserviceplansinaccordancewiththerequirementsofthebiddingdocumentstorespondtothebiddingdocuments.1.10.3Thebiddingdocumentsshallprovidetechnicalsupportmaterialsforthetechnicalrequirementslistedinthesubstantiverequirementsandconditions.Thetechnicalsupportmaterialsshallbebasedontheprintedmaterialspubliclyreleasedbythemanufacturer,orthetestreportissuedbythetestingagencyorotherformsallowedinthepreviousappendixtotheBidder'sInstructions.Ifitdoesnotmeettheaboverequirements,itshallbedeemedthatthereisnotechnicalsupportmaterialanditsbidwillberejected.1.10.4IfthepreviousappendixtotheBidder'sInstructionsstipulatestherangeofdeviationsandthemaximumnumberofdeviations,thedeviationsshallcomplywiththedeviationrangeandthemaximumnumberofdeviationsstipulatedinthepreviousappendixtotheBidder'sInstructions.Bidsexceedingthedeviationrangeandthemaximumnumberofdeviationswillberejected.1.10.5Alldeviationsofthebiddingdocumentsfromthebiddingdocumentsshallbelistedinthecommercialandtechnicaldeviationtableofthebiddingdocuments.Exceptforthelistedcontents,thebiddershallbedeemedtohaverespondedtoalltherequirementsofthebiddingdocuments.1.11BlacklistandFocusList1.11.1NoticeBlacklistPunishmentProvisions:Implementjointpunishmentof"onebreachoftrust,restrictionseverywhere"formarketentitiesontheblacklistandfocuslistofthegroupandcompany,andimplementcomprehensiveentrybanorkeysupervisionmeasuresintheentiregroupandcompanyandallbusinessareas.1.11.2CircumstanceDeterminationBasedondifferentfactsofbreachoftrustandtheimpactcaused,therelevantmarketentitieswillbeincludedintheblacklistandfocuslistrespectively:Thespecificcircumstancesareasfollows:(I)UnethicalBehavior1.Bribingcompanypersonnelortheirrelativesorspecificrelatedpersons.2.Givinggifts,gifts,andsecuritiestocompanypersonnelortheirrelatives.3.Payingandreimbursingexpensesthatshouldbepaidbycompanypersonnelortheirrelativespersonally.4.Usingresourcestofacilitatecompanypersonnelortheirrelativestoinvestinshares,personalloans,buyandsellstocksandbonds,etc.5.Providingconvenienceforcompanypersonneltopurchaseorrenovatehousing,getmarriedorhavefunerals,arrangeschoolingorworkforspousesandchildren,andgoabroadortravel,etc.6.Arrangebanquets,fitness,entertainmentandotheractivitiesforcompanypersonnelthatmayaffecttheimpartialperformanceofofficialduties.7.Purchaseorprovidecommunicationtools,transportationtoolsandhigh-endofficesuppliesforcompanypersonnelortheirrelatives.8.Allowcompanypersonnelortheirrelativesandspecificrelatedpersonstoinvestincooperativeenterprises,holdimportantpositionsandrelatedbusinesspositions.9.Otheractsthatcausecompanypersonneltobepunishedbylawsandregulationsorpartydisciplineorcompanypenalties.10.OtherdishonestactssuchasviolatingthePartyConstitutionandotherpartyregulations,nationallawsandregulations,andcompanyregulations.(II)Dishonestbehavior1.Bidding,collusion,andpricegouging.2.Biddingorbiddinginthenameofothersorobtainingabid(selection)byfraudulentmeanssuchasprovidingfalsequalificationsandmaterials.3.Refusingtosignacontractafterwinningthebidorfailingtoperformthecontractaftersigningthecontract(exceptforforcemajeure).4.Subcontractingorsubcontractinginviolationofthecontractagreement.5.Intheprocessoffulfillingthecontract,maliciouslyextortorblackmailbymeansofstoppingworkorobstructingwork,inordertoincreasethecontractpriceorobtaincompensation.6.Safety,qualityandenvironmentalprotectionaccidents(incidents)causedbyillegalorirregularactivitiesorproductproblems,orcausedlossestothecompany.7.Complainedbytheprojectandbearthemainresponsibility.8.Fabricate,distortfactsorprovidefalsematerialstomaliciouslyinitiatelitigationorarbitrationagainstthecompanyanditsaffiliatedunits.9.Refusetolistentotheadviceofthestaff,maliciouslytakeanyoftheactionslistedinArticle26ofthe"RegulationsonPetitionWork"(effectivefromMay1,2022),andafterverification,themotivesofpetitioningarebad,thedemandsareseriouslyunreasonableandillegal,andtheyare"seekingsolutionsbymakingtrouble"toobtainimproperbenefits.10.Otherdishonestbehaviorssuchasviolationsofrelevantlaws,regulations,rules,normativedocumentsandrelevantcompanyregulations.(III)Othercircumstances1.Determinedasadishonestpersontobeenforcedbytheeffectivelegaldocumentsofthepeople'scourt;determinedtohaveseriousdishonestbehaviorbytheeffectivedocumentsoftheadministrativeagency.2.ListedinthelistofseriousillegaldishonestyandabnormaloperationbytheNationalEnterpriseCreditInformationPublicitySystem.3.Listedinthelistofseriousdishonestentitiesbythe"CreditChina"website.4.Officiallettersfromsuperiorsorotherunitshavedeterminedthattherearedishonestbehaviorsormajordishonestbehaviors.5.Blacklistsandkeyfocuslistsprovidedbythecompany'sintegrityandhonestyco-constructionandsharingcooperationunits.1.11.3DisciplinarymeasuresForthoselistedontheblacklist,accordingtothespecificfactsandcircumstances,a1-year,3-yearorpermanentbanwillbeimplementedwithinthecompany.Duringtheeffectiveperiodoftheban,nooneshallparticipateinproductionandoperationactivitiessuchasbidding;iftheyareincludedinthecompany'sblacklistforthesecondtime,theyshallbepermanentlybanned.Forthoselistedonthekeyfocuslist,accordingtothespecificfactsandcircumstances,theuserunitshallgiveinterviews,warnings,andordersforrectification,andstrengthensupervisionandinspection,andgivekeysupervision.Theeffectiveperiodforrectificationcanbesetaccordingtothespecificfactsandcircumstances.Duringtherectificationperiod,nooneshallparticipateinnewproductionandoperationactivitiessuchasbiddingandprocurement.Iftherectificationisnotcompletedwithintherectificationperiodorisincludedinthefocuslistbythethreeunits,itwillbeincludedintheblacklist.1.11.4RepairmechanismFortherelevantmarketentitiesthathavecompletedthebanorrectificationperiodandcompletedtherectificationwithintheperiod,activelycorrectedthedishonestbehavior,eliminatedtheadverseeffectsandpromisedtostrictlyabidebythecompany'screditmanagementsysteminthefuture,thecreditrepaircanbecompletedaccordingtotheprocedures.1.11.5CreditcommitmentletterAccordingtothemanagementmeasuresfortheblacklistandfocuslistoftheCCCCandCCCC'scooperativeunits,thebidderneedstoprovideacreditcommitmentletterasfollows:Creditcommitmentletter(sample)Inordertocreateanopen,fair,just,honestandtrustworthytradingenvironmentandestablishtheimageofhonestandlaw-abidingsuppliers(subcontractors,serviceproviders,etc.),Imakethefollowingcommitmentsonbehalfofthisunit:(i)Allinformationsubmittedislegal,true,accurateandvalid,withoutanyforgery,modificationorfalseelements,andIamresponsiblefortheauthenticityoftheinformation.(ii)Updatetheunitinformationinatimelymannerandberesponsibleforthevalidityoftheinformationprovided.(III)Strictlyabidebylaws,regulations,rulesandmanagementrequirementsnotifiedinadvancebyprojectunits,andcarryouttradingactivities;activelyfulfillsocialresponsibilitiesandpromotetheconstructionofcleangovernment.(IV)Self-disciplineandself-management,donotengageinfraud,bidrigging,maliciouscomplaints,bribery,interferencewithtradingactivitiesandotherprohibitedbehaviorsbylawsandregulations,andconsciouslymaintainthegoodorderofprojecttransactions.(V)Abidebycontracts,valuecredit,fulfillcontractsingoodfaith,andconsciouslyacceptsupervisionfromCCCC,projectunits,thepublic,andnewsmedia.(VI)Voluntarilyacceptinspectionsbygovernmentdepartments,CCCCandprojectunitsinaccordancewithlawsandregulations.Ifillegalorbadbehaviorsoccur,voluntarilyacceptthepenalties(handling)givenbygovernmentdepartments,CCCCandprojectunitsinaccordancewithlawsandregulations,andbearcompensationandcriminalliabilityinaccordancewithlawsandregulations.(VII)HaverecognizedandcompliedwiththerelevantprovisionsofCCCCandprojectunitsontheblacklistandkeyfocuslist"oneplaceofdishonesty,restrictionseverywhere"jointpunishmentandtheco-constructionandsharingofhonestyandintegrity.(VIII)TherearenoCCCCemployeesandtheirrelativesamongthelegalrepresentative,controllingshareholder,actualcontroller,director,supervisor,seniormanager,orprojectteamofthisunit(exceptforthebiddingunitthatisasubsidiaryofCCCC).(IX)Concessionstotheprojectunitshouldbemadepublic,andnoprivatenegotiationsshouldbeconductedwiththeprojectunitemployeesonmatterssuchascontractnegotiation,signing,performance,andliabilityforbreachofcontract.Concessionsshouldnotbetransferredtoprojectunitemployeesandtheirrelativesinthenameofkickbacks,remuneration,commissions,rewards,allowances,part-timewages,etc.;expensesthatshouldbepaidbyprojectunitemployeespersonallyshouldnotbereimbursedorpaid;andtransportation,communicationtools,high-endofficesupplies,etc.shouldnotbeprovided.Nopropertyorbenefitsshouldbeprovidedtoprojectunitemployeesandtheirrelatives.Donotmailorgivegifts,cashgifts,consumercards(vouchers),securities,equity,stocks,bonds,otherfinancialproducts,localspecialties,paymentvouchers,prepaidcards,electronicredenvelopes,giftcertificates,houses,vehicles,antiques,etc.thatmayaffectfairtrade;donotprovidebanquets,travel,fitness,entertainmentandotheractivitiesthatmayaffectfairtrade;donotprovideconvenienceandpreferentialconditionsforprojectunitemployeesandtheirrelativestodobusinessandrunenterprises,anddonotprovideconveniencefortheiremployment,goingabroad,travelingandvacationing,weddingsandfunerals,children'sschooling,jobpromotion,workarrangements,purchaseordecorationofhouses,investmentorbuyingandsellingstocksandbonds;donotprovideloansorhouseandvehicleborrowingforvariousreasons;donotprovidecommercialbribesindisguisedformsunderthenamesofcharitabledonations,socialresponsibilityexpenses,etc.DonotaskprojectunitemployeesaboutbusinesssecretsinvolvingCCCCandprojectunits;havetheobligationtocooperateandprovideevidencematerialswhenCCCCandprojectunitsconductinvestigationsonsuspectedunethicalbusinesspractices.Otherintegrityrequirements(addedbyeachunit).(X)Ihavecarefullyreadandapprovedtheabovecommitment,andhavepromotedandeducatedthestaffofthisunit.Signatureofthelegalrepresentative:Unitname(stamp)Date2.TenderDocuments2.1CompositionofTenderDocumentsThetenderdocumentsinclude:(1)TenderNotice;(2)InstructionstoBidders;(3)TenderEvaluationMethod;(4)ContractTermsandFormat;(5)SupplyRequirements;(6)TenderDocumentFormat;(7)NoticeofBlacklistandFocusList;(8)OtherMaterialsSpecifiedintheAppendixtotheInstructionstoBidders.TheclarificationsandmodificationsmadetothetenderdocumentsinaccordancewithSections1.9,2.2and2.3ofthisChaptershallconstituteanintegralpartofthetenderdocuments.2.2ClarificationofTenderDocuments2.2.1Biddersshallcarefullyreadandchecktheentirecontentsofthetenderdocuments.Ifanypageismissingortheattachmentisincomplete,theyshallpromptlyreportittothetendererforcompletion.Ifthereareanyquestions,theyshallsendthequestionstothetendererinthetimeandformspecifiedintheAppendixtotheInstructionstoBidders,andrequestthetenderertoclarifythetenderdocuments.2.2.2ClarificationsofthebiddingdocumentsshallbesenttoallbidderswhohavepurchasedthebiddingdocumentsintheformspecifiedintheappendixtotheInstructionstoBidders,butthesourceoftheclarificationsshallnotbespecified.Iftheclarificationissentlessthan15daysbeforethedeadlineforsubmissionofbidsspecifiedinSection4.2.1ofthischapter,andtheclarificationcontentmayaffectthepreparationofthebiddingdocuments,thedeadlineforsubmissionofbidsshallbeextendedaccordingly.2.2.3Afterreceivingtheclarification,thebiddershallnotifythetendererinthetimeandformspecifiedintheappendixtotheInstructionstoBidderstoconfirmthattheclarificationhasbeenreceived.2.2.4Unlessthetendererconsidersitnecessarytoreply,thetendererhastherighttorefusetorespondtoanyclarificationrequestfromthebidderafterthetimespecifiedinSection2.2.1ofthischapter.2.3Modificationofthebiddingdocuments2.3.1ThetenderershallmodifythebiddingdocumentsintheformspecifiedintheappendixtotheInstructionstoBiddersandnotifyallbidderswhohavepurchasedthebiddingdocuments.Ifthetimeformodifyingthebiddingdocumentsislessthan15daysfromthebiddeadlinespecifiedinItem4.2.1ofthischapter,andthemodifiedcontentmayaffectthepreparationofthebiddingdocuments,thebiddeadlinewillbeextendedaccordingly.2.3.2Afterreceivingthemodifiedcontent,thebiddershallnotifythetendererinthetimeandformspecifiedintheappendixbeforethebidder'sinstructionstoconfirmthatthemodificationhasbeenreceived.2.4ObjectiontothebiddingdocumentsIfthebidderorotherinterestedpartyhasanyobjectiontothebiddingdocuments,itshallberaisedinwriting10daysbeforethebiddeadline.Thetendererwillrespondwithin3daysfromthedateofreceiptoftheobjection;beforeresponding,thebiddingactivitieswillbesuspended.3.BiddingDocuments3.1CompositionofBiddingDocuments3.1.1Thebiddingdocumentsshallincludethefollowingcontents:(1)Biddingletter;(2)Identitycertificateorpowerofattorneyofthelegalrepresentative(headoftheunit);(3)Itemizedquotationform;(4)Qualificationreviewmaterials;(5)Relevantserviceplan;(6)Creditcommitmentletter;(7)OthermaterialsspecifiedintheprecedingtableoftheBidder'sInstructions.Theclarificationsandconfirmationsmadebythebidderinthebidevaluationprocessthatcomplywiththelaws,regulationsandbiddingdocumentsshallconstitutethecomponentsofthebiddingdocuments.3.1.2IftheprecedingtableoftheBidder'sInstructionsstipulatesthatconsortiumbiddingisnotaccepted,orthebidderhasnotformedaconsortium,thebiddingdocumentsshallnotincludetheconsortiumagreementreferredtoinSection3.1.1(3)ofthischapter.3.1.3IftheprecedingtableoftheBidder'sInstructionsdoesnotrequirethesubmissionofabidsecurity,thebiddingdocumentsshallnotincludethebidsecurityreferredtoinSection3.1.1(4)ofthischapter.3.2BiddingQuotation3.2.1Thebiddingquotationshallincludethevalue-addedtaxstipulatedbythestate.UnlessotherwisespecifiedintheappendixtotheBidder'sInstructions,thevalue-addedtaxshallbecalculatedaccordingtothegeneraltaxcalculationmethod.BiddersshallmakequotationsinthebiddingletterandfillintheitemizedquotationtableinaccordancewiththerequirementsofChapter6"BiddingDocumentFormat".3.2.2Biddersshallfullyunderstandtheoverallsituationoftheprojectandotherfactorsaffectingthebiddingquotation.Quotationprinciple:meetthelowestandreasonablemarketpriceQualitystandard:meetthequalitystandardrequirementsoftheIndonesianMinistryofPublicWorksPackagingrequirements:meetnationalstandardsDeliverylocation:ConstructionsiteofSection1BoftheSemarangtoDemarkTollRoadProjectinIndonesiaTransportationrequirements:meettheneedsofPartyAMeasurementmethod:volumemeasurementSettlementterms:monthlysettlementisimplemented,andthesettlementperiodisfromthe16thofthepreviousmonthtothe15thofthismonth.Afterthe15thofeachmonth,PartyAandPartyBshallcheckthesupplyquantityoftheprevioussettlementperiodandgothroughthesettlementprocedures.PartyBshallprovidePartyAwithalegal,validandequalvalue-addedtaxspecialinvoiceasthebasisforpayment.(IfthepaymenttimeisdelayedduetotheinvoiceprovidedbyPartyB,PartyBshallbeartherelevantresponsibilities)Paymentterms:AfterPartyBdeliversthematerialstoPartyA'son-sitereceivinglocation,itshallnotifyPartyAtoconductacceptance.Aftertheacceptanceisqualified,bothpartiesshallsettletheaccount.PartyAshallpaythepurchaseprice30daysafterreceivingthecorrespondinginvoiceandtaxinvoice.BeforePartyBprovidesPartyAwiththetaxpaymentcertificateSPT,PartyAwilldeductPPNfromthepaymentuntilPartyBprovidesthetaxpaymentcertificateofthecorrespondinginvoice.ThepaymentofthepurchasepricecannotexemptPartyBfromtheresponsibilityitshouldbearforthequalityofthegoods.IfPartyApaysoverdue,thetwopartiesshallpostponethepaymentafterfriendlynegotiation,butPartyBcannotstopsupplyinggoodswithoutreasonablepriorwrittennoticetoPartyA,otherwisePartyBshallbearthelossescausedtoPartyA.3.2.3Thebidpriceisthesumoftheamountsofeachsub-itemquotation.Ifthebidpriceisinconsistentwiththetotalpriceofthesub-itemquotation,thebidpriceshallbecorrectedbasedonthecumulativetotalpriceofeachsub-item;iftherearemissingitemsinthesub-itemquotation,thepriceofthemissingitemshallbedeemedtobeincludedinothersub-itemquotations.Ifthebiddermodifiesthetotalbidpriceinthebidletterbeforethebiddeadline,thebiddershallalsomodifythecorrespondingbidinthe"Sub-itemQuotationTable"ofthebiddocument.ThismodificationshallcomplywiththerelevantrequirementsofSection4.3ofthischapter.3.2.4Ifthetenderersetsamaximumbidprice,thebidpriceofthebiddershallnotexceedthemaximumbidprice,whichisstatedinthetablebeforethebidder'sinstructions.3.2.5Thesupplierquotationdocumentofelectronicprocurementconsistsofanelectronicquotationtableandattachments.Whenthecontentoftheelectronicquotationtableconflictswiththatoftheattachment,thedataintheelectronicquotationtableshallprevail.3.2.6Otherrequirementsforbidquotationsareshowninthetablebeforethebidder'sinstructions.3.3Bidvalidityperiod3.3.1Unlessotherwisespecifiedinthetablebeforethebidder'sinstructions,thebidvalidityperiodis90days.3.3.2Ifthebidderwithdrawsthebiddocumentduringthebidvalidityperiod,itshallbeartheresponsibilitiesstipulatedinthetenderdocumentsandlaws.3.3.3Iftherearespecialcircumstancesthatrequiretheextensionofthebidvalidityperiod,thetenderershallnotifyallbidderstoextendthebidvalidityperiod.Thebiddershallrespond.Ifthebidderagreestotheextension,thevalidityperiodofitsbidbondshallbeextendedaccordingly,butitshallnotberequiredorallowedtomodifyitsbiddocuments;ifthebidderrefusestheextension,itsbidshallbeinvalid,butthebiddershallhavetherighttorecoveritsbidbondandthebankdepositinterestofthebidbondsubmittedincashorcheckforthesameperiod.3.4Bidbond3.4.1Whensubmittingthebiddocuments,thebiddershallsubmitthebidbondintheamountandformspecifiedintheprevioustableofthebidder'sinstructionsandthebidbondformatspecifiedinChapter6"BiddingDocumentFormat"anditshallbeanintegralpartofitsbiddocuments.Thebidbondsubmittedbydomesticbiddersincashorcheckshallbetransferredfromtheirbasicaccountandthebasicaccountopeningcertificateshallbeattachedtothebiddocuments.Forconsortiumbids,thebidbondcanbesubmittedbytheleaderandshallcomplywiththeprovisionsoftheprevioustableofthebidder'sinstructions.3.4.2IfabidderfailstosubmitabidsecurityasrequiredbyItem3.4.1ofthisChapter,theBidEvaluationCommitteewillrejectitsbid.3.4.3TheTendererwillrefundthebidsecuritytotheunsuccessfulbidderandthesuccessfulbidderwithin5daysaftersigningthecontractwiththesuccessfulbidderatthelatest.Ifthebidsecurityissubmittedincashorcheck,thebankdepositinterestforthesameperiodshallberefunded.3.4.4Thebidsecuritywillnotberefundedinanyofthefollowingcircumstances:(1)Thebidderwithdrawsthebiddocumentwithinthebidvalidityperiod;(2)Afterreceivingthenoticeofwinningthebid,thesuccessfulbidderdoesnotenterintoacontractwiththetendererwithoutjustifiablereasons,proposesadditionalconditionstothetendererwhensigningthecontract,orfailstosubmittheperformancesecurityasrequiredbythetenderdocuments;(3)OthercircumstancesspecifiedinthetablebeforetheBidder'sInstructionsforNotificationofBiddersoccurwherethebidsecuritymaynotberefunded.3.5QualificationReviewMaterialsUnlessotherwisespecifiedintheAppendixtotheInstructionstoBidders,biddersshallprovidequalificationreviewmaterialsinaccordancewiththefollowingprovisionstoprovethattheymeetthequalifications,financial,performance,reputationandotherrequirementsspecifiedinSection1.4ofthischapter.3.5.1The"BasicInformationFormofBidders"shallbeaccompaniedbycopiesofthequalificationsorqualificationcertificatesofthebidderanditsmanufacturer(applicabletothecaseofagentdealerbidding)andcopiesofthebiddingmaterialsinspectionorcertificationmaterials,includingcopiesofNIB,NPWP,KTP;3.5.2The"RecentFinancialStatusStatement"shallbeaccompaniedbycopiesoffinancialaccountingstatementsauditedbyanaccountingfirmorauditingagency,includingbalancesheets,cashflowstatements,incomestatementsandfinancialstatusstatements.Forspecificyearrequirements,seetheAppendixtotheInstructionstoBidders.IftheestablishmenttimeofthebidderislessthantheyearspecifiedintheAppendixtotheInstructionstoBidders,afinancialstatusstatementsinceitsestablishmentshallbeprovided.Inthebiddingdocumentformat(IV)QualificationReviewMaterials(II)RecentFinancialStatusTable,uploadscannedcopiesofrelevantmaterialsaccordingtothequalificationconditionsofthebiddingdocumentsandtherequirementsofthebiddinginstructions.3.5.3The"TableofSimilarProjectsCompletedinRecentYears"shallbeaccompaniedbyanoticeofwinningorcontractagreement.Forspecifictimerequirements,pleaserefertothetablebeforetheBidder'sInstructions.Onlyoneitemshallbefilledineachform,andtheserialnumbershallbeindicated.3.5.4The"TableofProjectsinSupplyandNewlyUndertaken"shallbeaccompaniedbyacopyofthenoticeofwinningorcontractagreement.Onlyoneitemshallbefilledineachform,andtheserialnumbershallbeindicated.Inthebiddingdocumentformat(IV)QualificationReviewMaterials(III)TableofSimilarProjectsCompletedinRecentYearsand(IV)TableofProjectsinSupplyandNewlyUndertaken,scannedcopiesofrelevantmaterialsshallbeuploadedaccordingtothequalificationconditionsofthebiddingdocumentsandtherequirementsofthebiddinginstructions.Uploadcompleteperformancematerialsincludingnoticeofwinningorsignedcontracts,etc.3.5.5"LitigationandArbitrationinRecentYears"shallexplaintherelevantcircumstancesofthematerialsalescontractsinwhichthebidderlost,andattachcopiesofrelevantlegaldocumentssuchasjudgmentsandrulingsmadebycourtsorarbitrationinstitutions.Forspecifictimerequirements,pleaserefertothetablebeforetheBidder'sInstructions.Inthebiddingdocumentformat(IV)qualificationreviewmaterials(V)recentlitigationandarbitrationsituations,accordingtothecontentoftheperformancecreditrequirementsinthebiddingdocumentqualificationconditions,providethequeryinformationoftheNationalEnterpriseCreditInformationPublicitySystem(ifany).3.5.6IfthepreviousappendixtotheBidder'sInstructionsstipulatesthattheconsortiumbidisaccepted,theformsandmaterialsspecifiedinItems3.5.1to3.5.5ofthischaptershouldincludetherelevantinformationofallpartiesintheconsortium.3.6AlternativeBiddingSchemes3.6.1UnlessotherwisepermittedbythepreviousappendixtotheBidder'sInstructions,thebiddershallnotsubmitanalternativebiddingscheme,otherwiseitsbidwillberejected.3.6.2Ifthebidderisallowedtosubmitanalternativebiddingscheme,onlythealternativebiddingschemesubmittedbythesuccessfulbiddershallbeconsidered.Ifthebidevaluationcommitteebelievesthatthealternativebiddingschemeofthesuccessfulbidderisbetterthanthebiddingschemepreparedinaccordancewiththerequirementsofthebiddingdocuments,thetenderermayacceptthealternativebiddingscheme.3.6.3Ifabidderprovidestwoormorebidquotations,orprovidesonequotationinthebiddocumentbutprovidestwoormoresupplyplansatthesametime,itshallbedeemedtoprovidealternativeplans.3.7Preparationofbiddocuments3.7.1ThebiddocumentshallbepreparedinaccordancewithChapter6"TenderDocumentFormat".Ifnecessary,anadditionalpagemaybeaddedasacomponentofthebiddocument.3.7.2Thebiddocumentshallrespondtothesubstantivecontentsofthetenderdocumentsuchasthesupplyperiod,bidvalidityperiod,supplyrequirements,andtenderscope.Onthebasisofmeetingthesubstantiverequirementsofthetenderdocument,thebiddocumentmaymakecommitmentsthataremorefavorabletothetendererthantherequirementsofthetenderdocument.3.7.3Allbiddocumentsshallbeinelectronicdocuments.Unlessotherwisespecifiedintheappendixtotheinstructionstobidders,thecertificatesanddocumentsattachedtothebiddocumentsshallbescannedcopiesoftheoriginals,andelectronicsealsshallbeaffixedinthecorrespondingpositionsasrequiredbythetenderdocument.Ifthebidissignedorstampedwithanelectronicsealbythelegalrepresentative(headoftheunit)ofthebidder,theidentitycertificateofthelegalrepresentative(headoftheunit)shallbeattached.Ifthebidissignedorstampedwithanelectronicsealbyanagent,apowerofattorneysignedbythelegalrepresentative(headoftheunit)shallbeattached.Forspecificrequirementsforsignatureorstamping,pleaserefertothetablebeforethebidder'sinstructions.4.Bidding4.1Sealingandmarkingofbiddingdocuments4.1.1BiddersshallsubmitbiddingdocumentsinaccordancewiththerequirementsofthebiddingdocumentsandthesupplychainmanagementinformationsystemofCCCC.Forspecificrequirements,pleaserefertothetablebeforethebidder'sinstructions.4.1.2Thecontentstobestatedontheenvelopeofthebiddingdocumentsareshowninthetablebeforethebidder'sinstructions.4.1.3Thetendererwillrejectthebiddingdocumentsthatarenotsealedinaccordancewithth
投标 / 标书制作要点(原创)
本塑料扁丝编织土工布涉及「招标公告」,投标方需重点关注:① 营业执照经营范围须含招标公告或对应服务类目;② 提供同类项目业绩证明;③ 报价方案与售后响应须明确;④ 紧盯投标截止与开标节点,建议提前完成标书制作与盖章。当地项目常要求本地化服务能力与快速响应,务必在投标文件中凸显。
标书制作联系冯经理:17551026086